Orroroo CWMS Stage 2
Orroroo 2024
Completion of stage 2 CWMS, using local contractors, digging through a tight easement connected a further 10 allotments and insertion of a 12,000L septic put.
Beach Road Culvert Installation
Nelson VIC 2024
While managing the environmental protection of the area, reconstruction of 500m of road reconstruction including dewatering at depth over 2m for the installation of and culvert road crossing.
South East Bores
Lameroo, Millicent & Tarpeena 2023
Across three bore sites, the team carried out demolition of existing compounds, including asbestos removal, following with connections into new bore pipe work and construction of new compound.
Springview Subdivisions
Mount Gambier 2023
Completion of stages 7, 8, 9 & 10. Consisting of the construction of roads and services.
Limestone Estate Subdivision
Mount Gambier 2023
Stages 1 & 2 consisting of 35 allotments. Level 1 supervision and testing was required for bulk excavation works. Supply of all facilities to blocks as well as installation of pumping station and lead in work to existing services.
Port MacDonnell WMR
Port MacDonnell 2023
Relay of watermain, including 500 metres of 100mm PVC, house connections, fire plugs, valves and completion of 5 shut downs.
Fisherman Bay Wastewater Lagoon & Bute Lagoons and Rising Main Upgrade
Fisherman Bay & Bute 2022
Construction of a new storage lagoon and associated pipework connecting into existing services for Port Broughton. Continuing with Bute wastewater lagoons and treatment plant, including 1.5kms of rising main connecting the local Football club.
Donovans SPS Relocation
Warrnambool VIC 2022
A complex project working in a tight location, working in with multiple subcontractors installing a 2.2m diameter pump station 6m deep. Combined with decommissioning an old sewer pump station while maintaining its function.
Tobruk Road Reconstruction
Robe 2021
Reconstruction of a residential street, this consisted of an 800metres box out and rebuild of road and intersection, installation of kerb, stormwater management for prone flooding areas, while maintaining access to home owners.
Robe CWMS Pump Station Upgrade
Robe 2020
Construction and installation of pump stations to hold 15,000 and 60,000 litres. Multiple dewatering systems were used to attain desirable working conditions.
Jamestown CWMS Pump Station Storage
Jamestown 2020
Construction and installation of plastream storage tanks. To assist council with up to 90kL of additional capacity.
Burnfoot Pastoral Catchment Dam
Salt Creek 2020
Earthworks for dam using CAT D5K, set up with GPS. Assistance with HDPE lining crew.
Robe CWMS Lagoon Upgrade
Robe 2019
Construct two 6,000m3 lagoons overlaid on the existing lagoon.
Orroroo CWMS Stage 1
Orroroo 2018 - 2019
Stage 1 of the CWMS to connect the commercial buildings of the township and construct the WWTP and reticulation system.
Koonibba Pipeline Upgrade
Koonibba 2019
1,000m watermain install 150mm diameter, 1m deep to tie into existing main.
Jamestown Rising Main Stage 1
Jamestown 2019
1,200m of rising main 150mm diameter.
Tumby Bay CWMS
Tumby Bay 2018
Installation of pump station, trenching and install of sewer gravity main in groundwater.
Cowell CWMS
Cowell 2015 - 2017
14,000m Sewer gravity mains, 225mm to 150mm diameter, 3,000m rising mains 50mm to 100mm PVC, installation of 4 pump stations, 15,000m2 road reinstatement and reconstruction. $7.5M
Beachport CWMS
Beachport 2012 - 2014
11,000m Sewer gravity mains, 300mm to 150mm diameter, 7,000m Rising mains 50mm to 200mm PVC, Installation of 8 pump stations, Construction of 50,000m2 of HDPE lined treatment ponds. $8M